Duisburg 3,800 m² asbestos removal - sawing off 24 balconies built of reinforced concrete

BWE Duisburg - 2,800 m² asbestos slabs including the substructure and mineral wool insulation were removed and disposed of in a residential building in compliance with all corresponding regulations. Furthermore sawing off, demolition and disposal of 24 balconies built of reinforced concrete.


Photo gallery and information
Demontage von Gipskarton<br />und Dämmung Neuss - concrete sawing and demolition works - disposal of hazardous substances

All services from a single source!
In an enterprise in Neuss 490 m² of an approx. 20 cm thick intermediate ceiling built of reinforced concrete were sawed up, dismantled and disposed of. In addition we dismantled 1,800 m² plasterboard partitions including insulation. Furthermore we removed 600 m² carpeted floor and hereafter ground all glue and carpet residues over the entire surface down to the concrete floor.


Photo gallery and information
Zügiger Abbruch Demolition, furniture store POCO at Dorsten

Project: Furniture store POCO at Dorsten, demolition of storage rooms, demolition works were completed, contaminated ground was excavated, filled back with RCL and compacted layer by layer.


Photo gallery and information
Eingerüstetes Gebäude Asbestos removal

Herten, Pankower Straße
Dismantling of 1,500 m² asbestos cement slabs and mineral fibre insulating panels including the substructure and the provision of 850 m² scaffolding and all the disposal work.
Dismantling time: 8 working days


Photo gallery and information
Der Turm Concrete sawing - public utilities Münster

Public utilities Münster -
9 floors of a stair tower built of reinforced concrete and part of the thermal power station, 37.80 m high, with a cross-cut of 5.70 m x 3.50 m and a wall thickness of 30 cm, were sawed off from inside by using a special procedure. Sawing works without using scaffolds, completely from inside, dust-free and free of vibrations.


Photo gallery and information
Außenansicht Disposal of hazardous substances

A new exciting venture for the Senft company in the field of recycling and disposal. We completely dismantled a passenger plane down to its individual components which were supplied to a recycling process in cooperation with a Dutch enterprise.


Photo gallery and information
Disposal of 2,800 - 3,000 m² asbestos slabs incl. artificial mineral fibre and the substructure

Kamen, Weimarerstraße 14
Here 2,800 - 3,000 m² asbestos slabs incl. the substructure and the artificial mineral fibre materials were dismantled and disposed of. The customer received all services from a single source, e. g. the erection of scaffolds over 3,500 m², the dismantling and disposal etc. The building project was subdivided into 3 construction stages to the effect that the new thermal insulated facade could be mounted again rapidly.


Photo gallery and information
Demolition of a residential building


Photo gallery and information
Schwere Technik Demolition of former colliery houses

Demolition of 23 former colliery houses.
Use of water in order to suppress formation of dust.


Photo gallery and information
Entfernen der Asbestplatten Theodor-Fliedner-Gymnasium in Düsseldorf

Here the whole ventilation system cladded with asbestos was restructured in a height of up to 10 m acc. to TRGS 519. The remaining dust had to be moisturized and removed using residual fibre bonding agents.


Photo gallery and information